Equipment Arrives
FirmGreen's equipment has traveled from Dublin, Ohio to
Houston, Texas, then by cargo ship to the port of Rio De Janeiro.
After arrival in Port Rio, the equipment was inspected
and then loaded onto trucks for the last leg of
the journey to the Gás Verde facility, located
at the Novo Gramacho landfill.
As it arrives, the team in Brazil is ready
to install and assemble the biogas purification
equipment that will produce biomethane. The cleaned
biogas will then be transported by pipeline (shown in slide #2) to help operate
the Petrobras plant just "down the hill".